• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
PowerStor®
PowerStor®

Liebert Series 610 UPS Installation Manual - 500-750kVA, 60Hz, Three Phase Multi-Module
Liebert Series 610 UPS Installation Manual - 500-750kVA, 60Hz, Three Phase Multi-Module

... The following warning applies to all battery cabinets supplied with UPS systems. Additional warnings and cautions applicable to battery cabinets may be found in: • Important Safety Instructions—page 1 • Section 2.0 - Unloading and Handling • Section 5.0 - Battery Installation ...
UMC100-FBP Marketing Presentation
UMC100-FBP Marketing Presentation

PowerStor - Bussmann
PowerStor - Bussmann

Appendix D-4  Electrical Advanced-Level Training Issue Date: XX/XX/XX
Appendix D-4 Electrical Advanced-Level Training Issue Date: XX/XX/XX

... A standard may be defined as a document that applies collectively to codes, specifications, recommended practices, test methods, and guides, which have been prepared by a standards developing organization or group, and published in accordance with established procedures. Standards promote safety, re ...
Guide and Requirements for Service at 69000 to 287000
Guide and Requirements for Service at 69000 to 287000

... SECTION 3.0 - CUSTOMER ELECTRICAL REQUIREMENTS SUBSECTION 3.1 - EQUIPMENT REQUIREMENTS It will be necessary for customers to coordinate their station insulation with the incoming transmission line insulation. At 230 kV and 287 kV it is BC Hydro's practice to install overhead ground wires on transmis ...
arc flash FREQUENTLY ASKED QUESTIONS
arc flash FREQUENTLY ASKED QUESTIONS

... OSHA mandates that employers identify electrical hazards, warn their workers about them and provide the proper protective equipment and training related to working around the hazards. OSHA provides the employer "what" to do, but does not define "how" to do it. The role of NFPA 70E, IEEE and NEC is t ...
Sevcon Powerpak trouble shooting guide
Sevcon Powerpak trouble shooting guide

Designing Power Isolation Filters with Ferrite Beads for Altera FPGAs
Designing Power Isolation Filters with Ferrite Beads for Altera FPGAs

Switchgear selection and application guide
Switchgear selection and application guide

Interconnection Requirements for Transmission Facilities 138 kV
Interconnection Requirements for Transmission Facilities 138 kV

SmartWire-DT The System
SmartWire-DT The System

... instructions enclosed with the device. Installation, commissioning, operation, maintenance and retrofitting of the SmartWire-DT components may be performed only by qualified personnel. The SmartWire-DT components may be used only in the areas recommended by us and only in conjunction with third-part ...
Evaluation of Solid-State Crowbars and Gas
Evaluation of Solid-State Crowbars and Gas

Dear and Respected Shalini I am sorry to Mr. Gerard Foley, his
Dear and Respected Shalini I am sorry to Mr. Gerard Foley, his

... I am sorry to Mr. Gerard Foley, his advice to refer to the www.discovercircuits.com is not right. First of all there is lot of difference among electrical, IT hardware and electronics trades. The said site is dedicated to electronics professionals like me and not for the fresh learners. And I also a ...
NZECP 28:1993 - Energy Safety
NZECP 28:1993 - Energy Safety

... which the cables are connected, or are to be connected; but (b) Excluding any increase in temperature which may be due to the heat arising from the cables at that point. ...
Synthesis of Averaged Circuit Models for Switched
Synthesis of Averaged Circuit Models for Switched

Induction Motor and Faults
Induction Motor and Faults

... Faults shown in Table 2.3 are in broad sense; stator fault may be of different kinds, and different types of faults may occur in rotor itself. For identification, faults in induction motors may be listed as follows—(i) broken bar fault, (ii) rotor mass unbalance fault, (iii) bowed rotor fault, (iv) b ...
US ARMY ENGINEER SCHOOL
US ARMY ENGINEER SCHOOL

MC33291 - NXP Semiconductors
MC33291 - NXP Semiconductors

ib0600367engd
ib0600367engd

... z Before wiring or inspection, power must be switched OFF. To confirm that, LED indication of the operation panel must be checked. (It must be OFF.) Any person who is involved in wiring or inspection shall wait for at least 10 minutes after the power supply has been switched OFF and check that there ...
Full-text
Full-text

V-Contact VSC Installation and service instructions 7.2/12 kV
V-Contact VSC Installation and service instructions 7.2/12 kV

... Use the ABB S282UC-C3 thermal-magnetic circuit-breaker or an equivalent type to protect the secondary circuits. After powering, the electronic board takes 15 seconds to perform self-diagnosis and then prepares for normal operation, depending on the configuration. Do not operate the contactor during ...
ieee transactions on circuits and systems
ieee transactions on circuits and systems

... The maximum reverse diode current before the snapback of in this work. For devices with the ggNMOS is defined as is usually large-array design, the effective device width higher than several thousands of micrometers in order to have high driving capability or low turn-on resistance in specified appl ...
switchboards
switchboards

... [High Contact Pressure Switch] [High contact pressure switch shall be quick-make, quick-break, trip-free type. Switch shall be Siemens HCP type or equivalent. Switch ratings and options shall be as shown on the drawings. [Switch shall include ground fault protection and indication.] [Bolted Pressure ...
Avoid Generator and System Damage Due to a Slow Synchronizing
Avoid Generator and System Damage Due to a Slow Synchronizing

< 1 ... 15 16 17 18 19 20 21 22 23 ... 353 >

Earthing system

In electricity supply systems, an earthing system or grounding system is circuitry which connects parts of the electric circuit with the ground, thus defining the electric potential of the conductors relative to the Earth's conductive surface. The choice of earthing system can affect the safety and electromagnetic compatibility of the power supply. In particular, it affects the magnitude and distribution of short circuit currents through the system, and the effects it creates on equipment and people in the proximity of the circuit. If a fault within an electrical device connects a live supply conductor to an exposed conductive surface, anyone touching it while electrically connected to the earth will complete a circuit back to the earthed supply conductor and receive an electric shock.A protective earth (PE), known as an equipment grounding conductor in the US National Electrical Code, avoids this hazard by keeping the exposed conductive surfaces of a device at earth potential. To avoid possible voltage drop no current is allowed to flow in this conductor under normal circumstances. In the event of a fault, currents will flow that should trip or blow the fuse or circuit breaker protecting the circuit. A high impedance line-to-ground fault insufficient to trip the overcurrent protection may still trip a residual-current device (ground fault circuit interrupter or GFCI in North America) if one is present. This disconnection in the event of a dangerous condition before someone receives a shock, is a fundamental tenet of modern wiring practice and in many documents is referred to as automatic disconnection of supply (ADS). The alternative is defence in depth, where multiple independent failures must occur to expose a dangerous condition - reinforced or double insulation come into this latter category.In contrast, a functional earth connection serves a purpose other than shock protection, and may normally carry current. The most important example of a functional earth is the neutral in an electrical supply system. It is a current-carrying conductor connected to earth, often, but not always, at only one point to avoid flow of currents through the earth. The NEC calls it a groundED supply conductor to distinguish it from the equipment groundING conductor. Other examples of devices that use functional earth connections include surge suppressors and electromagnetic interference filters, certain antennas and measurement instruments.Regulations for earthing system vary considerably among countries and among different parts of electric systems. Most low voltage systems connect one supply conductor to the earth (ground).People use an earthing system mainly for these applications: To protect a structure from lightning strike, directing the lightning through the earthing system and into the ground rod rather than passing through the structure. Part of the safety system of mains electricity, preventing problems associated with floating ground and sky voltage. The most common ground plane for large monopole antenna and some other kinds of radio antenna.Other, less common applications of earthing systems include: single-wire earth return. part of a system that powers small devices from sky voltage. one at each end of a ground dipole ELF antenna.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report