Liebert Series 610 UPS DISCONTINUED PRODUCT
... Liebert Series 610™ UPS Installation Manual - 500-750kVA, 60Hz, Three Phase Multi-Module ...
... Liebert Series 610™ UPS Installation Manual - 500-750kVA, 60Hz, Three Phase Multi-Module ...
Requirements for Complex Revenue Metering
... 2. Disclaimer This document is not intended as a design specification or as an instruction manual for the Customer/Power Generator and this document shall not be used by the Customer/Power Generator for those purposes. Persons using information included in this document do so at no risk to BC Hydro, ...
... 2. Disclaimer This document is not intended as a design specification or as an instruction manual for the Customer/Power Generator and this document shall not be used by the Customer/Power Generator for those purposes. Persons using information included in this document do so at no risk to BC Hydro, ...
Uniform Electrical Wiring Guide
... This guide is intended to clarify and supplement that portion of the National Electrical Code (NFPA 70-2011) used by most homeowners and contractors. The information contained herein does not preempt any federal, state or local codes, including the National Electrical Code, NFPA 70-2011. The 2011 Un ...
... This guide is intended to clarify and supplement that portion of the National Electrical Code (NFPA 70-2011) used by most homeowners and contractors. The information contained herein does not preempt any federal, state or local codes, including the National Electrical Code, NFPA 70-2011. The 2011 Un ...
IEEE Draft Guide for the Specification of Fixed
... Attention is called to the possibility that implementation of this guide may require use of subject matter covered by patent rights. By publication of this guide, no position is taken with respect to the existence or validity of any patent rights in connection therewith. The IEEE shall not be respon ...
... Attention is called to the possibility that implementation of this guide may require use of subject matter covered by patent rights. By publication of this guide, no position is taken with respect to the existence or validity of any patent rights in connection therewith. The IEEE shall not be respon ...
Transmission to Distribution/ End-User Interconnection Guidelines
... Upon completion of the interconnection study and acceptance of the required interconnection facilities, DPC and the distribution project developer shall notify the reliability entities of the modified existing or new transmission facilities required for this transmission to distribution interconnect ...
... Upon completion of the interconnection study and acceptance of the required interconnection facilities, DPC and the distribution project developer shall notify the reliability entities of the modified existing or new transmission facilities required for this transmission to distribution interconnect ...
ESH Manual Chapter 8: Electrical Safety
... General Requirements for a Qualified Person A qualified person is an individual recognized by SLAC management as having sufficient understanding of the equipment, device, system, or facility to positively control any hazards it presents. Recognition of a person’s qualification for operating complex ...
... General Requirements for a Qualified Person A qualified person is an individual recognized by SLAC management as having sufficient understanding of the equipment, device, system, or facility to positively control any hazards it presents. Recognition of a person’s qualification for operating complex ...
Guidance on Overhead Line Clearances
... clearances are based on normal use of any land, buildings or structures crossed by the line, unusual situations can only be determined by local risk assessment and may require an increase in the clearances specified. Where effectively insulated conductors are used, ground clearances over roads acces ...
... clearances are based on normal use of any land, buildings or structures crossed by the line, unusual situations can only be determined by local risk assessment and may require an increase in the clearances specified. Where effectively insulated conductors are used, ground clearances over roads acces ...
ABWR 2.12 Station Electrical Systems 2.12.1 Electrical Power Distribution System
... The UATs are sized to supply their load requirements, during design operating modes, of their respective Class 1E divisions and non-Class 1E load groups. UATs are separated from the RAT(s). In addition, UATs are provided with their own oil pit, drain, fire deluge system, grounding, and lightning pro ...
... The UATs are sized to supply their load requirements, during design operating modes, of their respective Class 1E divisions and non-Class 1E load groups. UATs are separated from the RAT(s). In addition, UATs are provided with their own oil pit, drain, fire deluge system, grounding, and lightning pro ...
Controlled Power, LLC 38kV Metal Clad Switchgear Guide
... Breakers not being used by the Switchgear assembly plant shall be appropriately marked, boxed, and protected against shipping and handling damage and delivered to a designation point provided by the owner. Actual circuit breakers of each rating being provided (not dummy elements) will be inserted in ...
... Breakers not being used by the Switchgear assembly plant shall be appropriately marked, boxed, and protected against shipping and handling damage and delivered to a designation point provided by the owner. Actual circuit breakers of each rating being provided (not dummy elements) will be inserted in ...
cpw paper
... When we look at our example of a transmission line based RF choke at 5 GHz, the main concern is the size of the transmission line. If we use a coplanar waveguide (CPW) as the transmission line, CPW line can be simulated as transmission line via Advanced Design System (ADS) tool in order to find out ...
... When we look at our example of a transmission line based RF choke at 5 GHz, the main concern is the size of the transmission line. If we use a coplanar waveguide (CPW) as the transmission line, CPW line can be simulated as transmission line via Advanced Design System (ADS) tool in order to find out ...