Survey							
                            
		                
		                * Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Improving Reliability and Performance of Electric Power Grids by Using High Performance Computing High Performance Computation Conference October 22-24 2008 Eugene A. Feinberg Department of Applied Mathematics & Statistics Stony Brook University Overview     Importance of electric power systems (EPS) Use mathematics and computations in EPS operations Solutions via High Performance Computing (HPC) Conclusions Importance of Electric Power Systems (EPS) What is EPS?  A system dedicated to the business of electric power:     Generation (Production) Transmission (Transportation) Distribution (Retailing) A “Mission Critical System” that provides a vital service to the society &, as such, should be operated with the goal of achieving:    Highest reliability standards Minimum environmental impacts Lowest operation costs US National Power Grid Data Source: FERC EPS Functions Although not normally owned or controlled by the power utility, consumption devices are part of the EPS & need to be modeled in EPS analysis. Power Generation Power Generation    Takes place in geographically dispersed power plants Power plants normally house multiple generating units Generating units can operate based on different:    Energy Sources Energy Conversion processes Units can be at different states (on/off) Energy Sources         Hydrocarbons (oil, coal, natural gas, etc.) Water Nuclear Wind Solar Tides Chemical etc Energy Converters       Conversion processes in a thermal power plant: Burners: Chemical energy ⇒ Thermal energy Boilers: Thermal energy ⇒ Mechanical energy Wind Turbines: Kinetic energy (KE) ⇒ Mechanical energy Rotating machines: KE ⇒ Electrical energy With today’s technology, overall conversion efficiency of a thermal power plant can approach 33% Power Transmission  Transmission networks are needed to :  Connect generating plants to consumption points  Create large power pools for increased reliability Power Transmission Equipment  Transformers        Step-up transformers Voltage Regulators Phase Shifters Step-down Transformers Transmission Lines & Cables Circuit Breakers & Disconnects Etc. Power Distribution   Receives electrical energy from the HV/MV (High Voltage/Medium Voltage) levels at bulk power delivery points Supplies energy to customers:    At standard voltage levels Single phase and/or three-phase Is made up of the following main equipment:      Distribution transformers (DXF) Feeder sections (including underground cables) Switches, fuses, reclosures Automatic load transfers Etc. Power Distribution EPS Operation Goals  Power Balance: Generation must remain balanced with demand    Generation Capacity (t)≥Total Generation (t) Total Generation (t) = Total Demand (t) System Security: Equipment power flows must not exceed equipment ratings, under normal or a single outage condition: |Pj (t)| ≤ Pj (t) max Power Quality Considerations Frequency Regulation: System frequency, must remain within its operational range  Voltage Regulation: Bus voltages must remain within their operational limits  Challenges for Power System Operations   Goal: meet the continually changing load demand for both active and reactive power while the desired system frequency and voltage profile are maintained. This should be done in the cost-efficient way From time to time blackouts happen. Major Blackouts in the Past 30 Years Northeast USA Blackout 80% of France Blackout 1978 Sweden Voltage Collapse 1983 France Voltage Collapse 1987 Mexico Blackout 1996 London Blackout Columbia Italy Blackout Malaysia… …. Moscow Blackout 2003 2005 2007 Weather Dependence    Electric loads fluctuate and depend on several factors including time and weather. Peak load usually happen in the afternoon during heat waves. Equipment also depend on weather characteristics such as ambient temperature and winds Complex Electricity Markets  In the last decades, with deregulation and introduction of competition, a new challenge has emerged for power market participants.  Price volatility Major Decision Making Processes for EPS   State Estimation  Estimate the steady states condition of EPS using online measured values Forecasting   Load, price, capacity, equipment states, rating, reliability analysis, etc. Control and Planning   Short term, medium term, long term Economic dispatch, optimal flow problem, energy trading, maintenance, area planning, capital expenditure, etc. Solutions for some of these problems are difficult and require intensive computations Solutions via High Performance Computing (HPC) Why we need HPC?    Challenges lead to several mathematical problems whose exact solutions are intractable HPC provides tools for the solutions of reasonable approximations in required time HPC is important for difficult scientific and engineering problems that can be solved by parallel computing.   EPS provide several such problems. Monte Carlo simulation is one of the mathematical methods that allows parallel algorithms. Simulation   Instead of simulating N scenarios on a sequential machine, it is possible to simulate N/M scenarios on each of M parallel processors. In addition to direct simulation, Monte Carlo simulation methods are used in contemporary optimization techniques:   Reinforcement Learning (neuro dynamic programming, approximate dynamic programming) Cross-Entropy Methods Problems of EPS using HPC: State Estimation    Provide reliable estimates of the quantities required for monitoring and control of the EPS a set of measurements obtained is centrally processed by a state estimator State Estimation model:     z –measurement vector x –true state vector h –nonlinear vector functions w –measurement error vector Problems of EPS using HPC: State Estimation  Challenges   Higher frequency -- shorten the time interval between consecutive state estimations to allow a closer monitoring of the system evolution particularly in emergency situations in which the system state changes rapidly Larger size -- enlarge the supervised network by extending state estimation to low voltage sub networks Problems of EPS using HPC: Forecasting  Load and Price Forecasting      Solutions use optimization methods Depend on the weather Require HPC in real time if there are unforeseen events (failures, sudden changes in the weather) Require HPC for simulation-based optimization Require weather forecasts. HPC is used for weather forecasting. Challenging problem: wind forecasting. Problems of EPS using HPC: Forecasting  Reliability Analysis   assess the ability of a multi-area power system satisfy the demand adequately satisfy the customer load requirements    Perform a chronological hourly simulation of the system based on the Monte Carlo simulation Compare the hourly load demand in each area to the total available generation in the area Areas with excess capacity will provide emergency assistance to those areas that are deficient, subject to the transfer limits between the areas. Problems of EPS using HPC: Forecasting  Optimization techniques in forecasting     Non-linear programming Dynamic programming Difficulties: Curse of dimension Solutions   Decomposition techniques Utilization of parallel computers Problems of EPS using HPC: Control and Planning  Optimal Flow    Goal: To obtain complete voltage angle and magnitude information for each bus in a power system for specified load and generator real power and voltage conditions Can be expressed as a classical mathematical program x and u represents respectively the states and controls variables Problems of EPS using HPC: Control and Planning  Optimal Flow      Most of the constraints represents the operational constraints or the automatic response of the power system Most of the objective functions represents economical or security aims These functions are nonlinear Typical problems involve around 2000 equality constraints and 4000 inequality constraints. Efficient way of dealing with high dimensionality of the problem is by Decomposition Techniques on HPC Problems of EPS using HPC: Control and Planning  Economic Dispatch    To find a set of active power delivered by the committed generators to satisfy the required demand at any time subject to the unit technical limits and at the lowest production cost. Important to solve this problem as quickly and accurately as possible. Techniques    Stochastic dynamic programming Computational requirements are usually high Implementation of parallel computing overcomes this difficulty Conclusions    EPS are vitally important for our society EPS are complex systems and their efficient control, management, and development depend on solutions of many difficult mathematical problems HPC is a natural tool to solve of these problems Thank you.