Download pdf overview

Document related concepts

Construction management wikipedia , lookup

PRINCE2 wikipedia , lookup

Phase-gate process wikipedia , lookup

Transcript
Product Certification Guide
Third Edition
SCOPE
The scope should identify things such as:
a.
b.
c.
d.
e.
f.
g.
Product,
TC or STC Make, Model, and Serial Applicability,
Prototype Aircraft,
Test Articles,
Work Locations,
Foreign CAA notification when work is to be done on a foreign registered aircraft,
Foreign Validations (both concurrent and sequential) when foreign validation is required
by Bi-Laterals,
h. Other things appropriate for the specific project such as the following.
When a TSOA project is being worked in parallel with a project for the installation of that TSOA
article in a TC, Amended TC, or STC project, the scope of the PSCP for each project should
refer to the other project and include any relevant information for the other project such as the
project number, the organization conducting the other project, and the associated FAA office(s)
the project is being worked under.
TC, Amended TC, and STC projects are normally conducted under the following FAA
directorates:
a.
b.
c.
d.
Small airplanes – Small Airplane Directorate
Transport airplanes – Transport Airplane Directorate
Rotorcraft – Rotorcraft Directorate
Engines or propellers – Engine and Propeller Directorate
REFERENCES AND ACRONYMS
This section should identify unique information applicable to the project such as:
a.
b.
c.
d.
e.
FAA Orders,
ACs,
Any unique or specific FAA guidance,
Abbreviations,
Unique Acronyms.
PROJECT DESCRIPTION
The project description should provide an introduction to the project and the relevant
background. For new TCs, this should include the systems and structure for the entire aircraft.
B-4