• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
EMI - Renesas e
EMI - Renesas e

Oakworks Trolley-Manual
Oakworks Trolley-Manual

PW Data Sheet - Spec-Tech Industrial Electric
PW Data Sheet - Spec-Tech Industrial Electric

DC to AC Conversion (INVERTER) - ENCON
DC to AC Conversion (INVERTER) - ENCON

... 4.6 NUETRAL POINT CLAMPED (NPC) INVERTERS  Known as three-level inverters  Problem of 2-level inverter in highpower applications  High DC link voltage requires series connection of devices  difficulty in dynamic voltage sharing during switching ...
III. 3-phase Active Shunt Filter
III. 3-phase Active Shunt Filter

... shunt filter (ASF). ASF is being used with success to reduce harmonic content in industry and distribution lines [6]. The use of ASF in wind turbines must be investigated. This paper presents an analysis and simulation of an active shunt filter (ASF) for harmonic mitigation in wind turbines generato ...
SI99-01 - Semtech
SI99-01 - Semtech

... Guard traces may be used in situations where a long (> 30cm) interconnected signal trace cannot be avoided (Figure 5). An even better solution is to place a ground plane opposite the signal line. The signal line should be within 13 mm of the guard trace or ground plane. Transpose long sections (> 30 ...
TT11 Circuit Breakers Name How Circuit Breakers Work by Tom
TT11 Circuit Breakers Name How Circuit Breakers Work by Tom

... Name _______________ ...
60- and 120-watt Power Supplies with trigger circuits
60- and 120-watt Power Supplies with trigger circuits

... plies ideal forr applicationss requiring sevveral levels of flashlamp  discharge energyy.    ...
1.2mm High Low-Profile Wire Wound Inductor Achieves Highest
1.2mm High Low-Profile Wire Wound Inductor Achieves Highest

... maximum value), a low-profile wire wound inductor just 1.2mm in height with a high current capability of 1A (at the inductance value of 10É H). The new product achieves the highest rated current for its size in the industry. In mobile equipment such as notebook PCs, LCD panels are essential for disp ...
Loose or corroded electrical connections
Loose or corroded electrical connections

... of electrical systems is that new electrical components begin to deteriorate as soon as they are installed. Whatever the loading on a circuit, vibration, fatigue and age cause the loosening of electrical connections, while environmental conditions can hasten their corroding. Briefly stated, all elec ...
Aalborg Universitet
Aalborg Universitet

... active and reactive powers [5-9]. That is why so many interesting and complicated PLLs have been reported in recent years,such as known DDSRF-PLL [11], DSOGIPLL [12], CDSC-PLL [13], EPLL [14], MCCF-PLL [15] and so on [16]. Noted that these kinds of PLLs should be carefully designed [17-18]. Also, a ...
POWER CIRCUITS AND DISTRIBUTION
POWER CIRCUITS AND DISTRIBUTION

... Engineers would like to spread the load of all the dimmers evenly between the three phases of the power supply so that the load on the neutral is balanced. If the dimmer numbers of all circuits on the first electric are 1 – 24 , and all of the lights hung on it are on at the same time, the load shou ...
SMJE 2103
SMJE 2103

... generator is driven by a 500-hp diesel engine and is used as a standby or emergency generator. This machine can also be paralleled with the normal power supply (a very large power system) if desired. (a) What are the conditions required for paralleling the emergency generator with the existing power ...
ECEN5817L38
ECEN5817L38

RF5622 3.0V TO 3.6V, 2.4GHz TO 2.5GHz LINEAR POWER AMPLIFIER Features
RF5622 3.0V TO 3.6V, 2.4GHz TO 2.5GHz LINEAR POWER AMPLIFIER Features

... RF5622 Theory of Operation and Application Information The RF5622 is a two-stage power amplifier (PA) with a typical gain of 30dB in the 2.4GHz to 2.5GHz ISM band. The RF5622 has integrated input and interstage matching components thus allowing a minimal bill of material (BOM) part count in end app ...
caution - Valsi Power Equipment
caution - Valsi Power Equipment

... The oil sensor mainly functions to detect position of the surface of engine oil in the crankcase of engines for general use and to stop the engine automatically when the oil level goes down below the lower limit specified. This prevents seizure of engine from occurring due to insufficient amount of ...
MTL MA15 Surge Protectors Manual PDF
MTL MA15 Surge Protectors Manual PDF

... The maximum rating of equipment protected by the surge protection device. Examples: For an in-line surge protection device with maximum specified through or line current of 15A, a. Connected to a 30A power supply - Protect with 15A maximum. b. Connected to a 8.5A UPS or standby generator - Protect a ...
Transmission System Supply Reliability and Quality Regulation
Transmission System Supply Reliability and Quality Regulation

... number of 34.5 kV line feeders for 100 MVA transformers is designed as 8+1, one being used for strategic loads. The neutral point of secondary winding of a transformer connecting the 154 kV system to a distribution system is earthed through 1000 A resistance. g) Arc furnace facilities are connected ...
Typical Factory Test Procedures for Medium
Typical Factory Test Procedures for Medium

... Typical Factory Test Procedures for Medium Voltage Products ...
Data Sheet - KB Electronics
Data Sheet - KB Electronics

... DESCRIPTION The KBBC series of battery powered variable speed controls are designed for 12, 24, 36, and 48 Volt PM and Series Wound DC motors. Microcontroller design provides superior performance and ease of tailoring to specific applications. Operating in a regenerative mode, precise and efficient ...
WHY TO NOT USE AN OHMMETER TO SELECT
WHY TO NOT USE AN OHMMETER TO SELECT

... Electrical field behavior at various voltages in a hypothetical 1200V diode (not to scale) ...
HECO News - OutBack Power Systems
HECO News - OutBack Power Systems

Introduction to PowerWorld Simulator
Introduction to PowerWorld Simulator

Safety Considerations in Power Supply Design
Safety Considerations in Power Supply Design

... The process for defining insulation requirements starts with identifying each circuit block within the system according to the categories described above: LCC, SELV, TNV, ELV, or Hazardous. Then, with this knowledge, the appropriate insulation type and number of levels can be defined for use betwee ...
LS-103D - Precision Rated Optics
LS-103D - Precision Rated Optics

< 1 ... 666 667 668 669 670 671 672 673 674 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report