Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules IHDR • ASTEQ-GmbH • Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann Photoconductor Detector Modules 1 PACS IHDR 12/13 Nov 2003 Overview • • • Completely Integrated Module Integrated QM Modules with FEEs RM Modules without FEEs • • • Optical / Mechanical Module <=> Camera Housing Interface Module Design – Electrical Interface – Thermal Budget – Support Post Stability: Cryovibration Tests Detector Stack and Final Bias Design Achieved Performance – Cut-off Wavelengths PA / QA Activities: Manufacturing Flow Plan • • Procurement of Parts for / Assembling of Flight Modules Summary • • Photoconductor Detector Modules 2 PACS IHDR 12/13 Nov 2003 Completely Integrated High Stress Module Leaf spring FO <= Cavity => FEE Pigtail Harness Cooling strap Photoconductor Detector Modules 3 PACS IHDR 12/13 Nov 2003 Integrated QM Modules with FEE 11 HS Modules and 12 LS Modules All modules did not have back-outs! QM HS with FEE Module S/N FO QM FEE FM 04 29 76 A02-038-15 FM 11 56 104 A02-527-01 HS module QM 03 (LENS) has been cryovibrated QM 03 has seen 28x cool downs to 4 K FEE "cycled" Pecularities Module repair 4 K Cool downs Cryovibrytion n Scratches onto pixels 7, 8, 12, 14 PACS-NT-RR-026 4 n n Small longitudinal crack (?) over a PACS-NT-RR-007 6 n third of pixel 5 n Small scratches onto pixels 12, 14 n 4 n y n 5 n y n 11 n n n 10 n n Scratch onto pixel 7, PACS-NT-RR-006 11 n scratches onto FEE substrate because of intensive R measurements FM 14 QM 04 QM 05 QM 07 QM 08 79 36 38 42 43 82 84 56 90 87 A02-527-11 A02-038-23 A02-038-28 A02-038-11 A02-038-25 QM 09 QM 10 44 45 88 89 A02-038-12 A02-038-13 n n Longitudinal crack over pixel 8 PACS-NT-GR-005 n n QM 11 33 QM 12 48 QM LS with FEE FM 26 35 FM 27 58 FM 34 66 FM 39 71 FM 40 72 FM 41 73 FM 42 74 QM 20 28 QM 21 39 QM 22 40 QM 23 41 QM 24 46 93 91 A02-038-21 A02-038-10 y n Longitudinal crack over pixel 6 - n n 99 92 97 105 69 100 101 98 70 71 106 72 A02-038-16 A02-038-19 A02-038-22 A02-038-04 A02-038-05 A02-038-29 A02-038-30 A02-038-17 A02-038-20 A02-038-02 A02-038-03 A02-038-14 n n n n n n n y y n n n - Photoconductor Detector Modules PACS-NT-RR-010 PACS-NT-RR-011 PACS-NT-RR-001 n n n PACS-NT-RR-012 n n n n PACS-NT-RR-009 6 10 + (25x to LN2) 9 6 n n 6 18 12 15 11 6 11 11 12 7 7 15 + (25x LN2) n n n y y n n y n y y n n n 4 PACS IHDR 12/13 Nov 2003 RM Modules without FEE: 13 HS Modules and 14 LS Modules RM HS Module S/N Dummy QM 19 20 Dummy QM 01 FM 01 10 49 FM 02 FM 03 FM 05 52 30 47 FM 06 FM 07 FM 08 FM 09 FM 10 FM 13 FM 15 FM 16 RM LS FM 28 53 50 51 54 55 58 80 86 FM 29 61 FM FM FM FM FM FM FM FM FM 30 31 32 33 35 36 37 38 43 FM 44 FM 45 60 FO 86 Pecularities Scratches onto pixels 8, 9 63 Dummy without signal-bias wires 108 Scratch onto pixel 2, residues onto pixels 3, 4, 14, glue dot onto pixel 7; Resistor SHD # 1 74 Scratches onto pixels 2, 7, 8, 16 57 Scratches onto pixels 1, 2, 11, 15 77 Scratches onto pixels 7; very small slit of detector contact to the cavity wall of pixel 6 52 Scratches onto pixels 11 78 65 Scratch onto pixels 6, 7, 14, glue dot onto pixels 3, 9, 14 59 60 61 Scratch onto pixels 1, 9 ,11 62 Scratch onto pixels 2, 7 102 Scratch onto pixels 2, 16 53 Module repair 4 K Cool downs Cryovibrytion PACS-NT-RR-035 4 n PACS-NT-RR-034 10 n n 2 n n 4 n PACS-NT-RR-027 2 n PACS-NT-RR-028 2 n PACS-NT-RR-029 2 n PACS-NT-RR-030 4 n n 4 n PACS-NT-RR-031 4 n PACS-NT-RR-032 2 n PACS-NT-RR-033 2 n 2 n 2 n PACS-NT-RR-013 18 n PACS-NT-RR-014 12 n 62 63 64 65 67 68 69 70 75 Small longitudinal crack (?) onto pixel 7, scratches onto pixels 8, 14, 15 96 Small longitudinal crack (?) onto pixels 9, 15, scratches onto pixels 3, 6, 14, 15 103 Scratch onto pixels 2, 6 66 Scratch onto pixels 9, 10 67 Scratch onto pixels 3 68 58 Resistor SHD # 2 55 80 Scratch onto pixels 5 81 Scratch onto pixels 7, 10 54 Scratch onto pixel 2, glue dot onto pixel 1 PACS-NT-RR-015 PACS-NT-RR-016 PACS-NT-RR-017 PACS-NT-RR-018 PACS-NT-RR-019 PACS-NT-RR-020 PACS-NT-RR-021 PACS-NT-RR-022 PACS-NT-RR-025 8 2 2 12 4 2 2 4 4 n n n n n n n n n 76 77 107 Scratch onto pixel 11 64 - PACS-NT-RR-024 PACS-NT-RR-023 2 4 n n Photoconductor Detector Modules 5 PACS IHDR 12/13 Nov 2003 Optical / Mechanical Module <==> Camera Interface Radial arrangement of 25 high stress modules in groups of 5 modules. The centre of the radial arrangement is 240 mm in front of the fore optics in the plane of the pupil. Photoconductor Detector Modules 6 PACS IHDR 12/13 Nov 2003 Electrical Interface Interface design • • • The nano connector of the pigtail harness is glued to the harness substrate Thermal loads from the CRE flow via the Au wires between FEE and harness through the cooling strap to the 4 K level To minimalise thermal load to the module: – – • Kapton supports for FEE and harness substrate All wires from the module to electrical interface parts are stainless steel; Problem under investigation: Ca. 5% of measured pixels “strange”! Contact resistance (?) between stainless steel wire and H20E Photoconductor Detector Modules 7 PACS IHDR 12/13 Nov 2003 Thermal Budget 25 Low Stress Modules 25 High Stress Modules 2.5 K 1.7 K 4K 4K 16 Detector Wires (Steel) 11 µW 202 µW 4 Long FEE + 2 Long Harness Posts (Kapton) 7 µW 162 µW P = 375 µW 2 Short Harness Posts (Kapton) 134 µW 108 µW P = 249 µW P = 624 µW Photoconductor Detector Modules 8 PACS IHDR 12/13 Nov 2003 Support Post Stability: Cryovibration Test Free bearing support post Kompression Bending Slit Free bearing Locating bearing Safety Factor (Calculation): 5 Locating bearing Free bearing Safety Factor (Calculation): 54 • 200 um Slit between kapton tube and support part (no gluing) at the free bearing support posts: - Compensation of thermal expansion coefficient for different materials (module, FEE/harness substrate, kapton tube, etc.) during cool-down. - After cool-down: slit = 0 - 50 um. • Static tests at LN2 temperatures: Design withstands forces corresponding up to accelerations of 110 g. • Above support post design passed cryo cycling and vibration tests with qualification load levels. Photoconductor Detector Modules 9 PACS IHDR 12/13 Nov 2003 Detector Stack in the Cavity and Final Bias Design 2 Detector Stack Ball segment Detector contact 1 Ge:Ga crystal Detector contact Final design • Bias concept has been changed to avoid detector short circuiting – Contact diameter decreased at the ball segment side to prevent grounding of the signal line (2) – Contact diameter increased at the ground side (this contact is grounded directly to the module (1) Insulator Gold wire 25 µm Slits reduced from 30 - 70 µm to 10 - 40 µm and therefore less cross talk Photoconductor Detector Modules 10 PACS IHDR 12/13 Nov 2003 Specification Cut-off Wavelength Specification high stress module: lCW > 200 µm @ 40 mV Specification low stress module: 125 < lCW <130 µm @ 100 mV Min Max 135 Min Max l CW (µm) l CW (µm) 205 200 30 mV 130 195 125 190 0 2 4 6 8 QM # - HS Photoconductor Detector Modules 10 12 12 14 16 18 20 22 24 QM # - LS 11 PACS IHDR 12/13 Nov 2003 PA / QA Activities: Manufacturing Flow (PACS-NT-PL-003) Cleaning and incoming inspection of all mechanical module parts Preparation of FEE / harness support posts Incoming inspection of FEE / Harness / Pigtail Gluing of the pigtail and cooling strap to the harness substrate Detector stack assembly and RSR measurement. Implementation of connector saver and short circuit connector KIP: Check of detector stack KIP Cleaning of the module and check with UV light KIP Final check (with UV light) of the completed module before shipping Photoconductor Detector Modules Integration of FEE / harness substrate, completion of electricalwiring, fixing of FO 12 PACS IHDR 12/13 Nov 2003 Procurement of Parts for / Assembling of Flight Modules • Status of parts procurement for Flight Modules - Procurement of small parts nearly finished - Delivery of FM FEEs starts end of November 2003 - Delivery of the pigtail from Cannon beginning of December 2003 - Procurement of FOs scheduled for December 2003 problem: Au coating not yet acceptable, solution mid November - Procurement of module bodies initiated (delay about 2 month) • Stack assembly of Flight Modules could starts around mid November if the pixel selection rule is confirmed by MPE • First sixpack not before end of January 2004 • Funding of Flight modules assured only until the end of 2. sixpack (end of February 2004) Time critical: Procurement / Assembly of Modules Photoconductor Detector Modules 13 PACS IHDR 12/13 Nov 2003 Summary • Interfaces to MPE housing, KT board and IMEC FEE and harness substrate defined • Module design finished (specifications fulfilled) but: Pending problem of Contact resistance (?) between stainless steel wire and H20E glue • Manufacturing of Flight Modules Initiated but: Pixel selection rule to be confirmed Photoconductor Detector Modules 14